American Contracting & Environmental Services, Inc.
Bid Title:
DC Water Plantwide Stormwater Drainage Improvements
Bid Due Date:
7/11/18
Bid Due Date Time:
2:00 PM
Bid Due Date Extension:
7/18/18
Bid Due Date Time Extension:
2:00 PM
Project Description:
This project consists of furnishing all labor, services, materials, tools, insurance and equipment necessary for the removal of existing equipment and material, cleaning, rebuilding and installation of existing equipment, installation of new equipment and material, proper performance and completion of the Plant-Wide Stormwater Drainage Improvements at the Blue Plains Advanced WWTP.
Part 1 Includes:
- Milling of existing roadway and parking areas
- Removal of drainage structures and plugging/abandoning existing drainage structures and pipes
- Providing full depth asphalt and overlay of roads and parking areas
- Installation of drainage structures and storm sewer pipes.
- Construction of two cast-in-place concrete pump stations.
- Installation of submersible pumps, valves and pump discharge force mains
- Electrical power supply to new pump stations
- Installation of instrumentation and control systems for new pump stations.
Part 2 Includes:
- Milling and overlay of existing roadway
- Removal of drainage structures, and plugging/abandoning existing drainage structures and pipes
- Providing full depth asphalt and overlay of roads
- Installation of drainage structures and pipes.
Divisions of work include:
Division 2- Earthwork, Paving, Landscaping, Trucking, Waste Collection, Equipment
Division 3- Cast-in-Place Concrete, Precast Concrete
Division 15- Stormwater Piping, Force Mains, Piping and Valves
Division 16- Electrical, Instrumentation & Control
Part 1 Includes:
- Milling of existing roadway and parking areas
- Removal of drainage structures and plugging/abandoning existing drainage structures and pipes
- Providing full depth asphalt and overlay of roads and parking areas
- Installation of drainage structures and storm sewer pipes.
- Construction of two cast-in-place concrete pump stations.
- Installation of submersible pumps, valves and pump discharge force mains
- Electrical power supply to new pump stations
- Installation of instrumentation and control systems for new pump stations.
Part 2 Includes:
- Milling and overlay of existing roadway
- Removal of drainage structures, and plugging/abandoning existing drainage structures and pipes
- Providing full depth asphalt and overlay of roads
- Installation of drainage structures and pipes.
Divisions of work include:
Division 2- Earthwork, Paving, Landscaping, Trucking, Waste Collection, Equipment
Division 3- Cast-in-Place Concrete, Precast Concrete
Division 15- Stormwater Piping, Force Mains, Piping and Valves
Division 16- Electrical, Instrumentation & Control
Posted On:
2018-06-20 08:24:32
Notes:
Please call Jeff Litwin or Jim Voltz at 301-490-9100 for more information if you are interested in bidding any portion of the work. We can provide more information on the scope of work for the project.