All Information
Company Name:
Archer Western
Bid Title:
MDSHA I-83 over Padonia Rd Bridge Replacement Project
Bid Due Date:
4/5/18
Bid Due Date Time:
12:00 PM
Project Description:
Archer Western is seeking qualified DBE subcontractors and suppliers for the MDSHA I-83 over Padonia Rd Bridge Replacement Project. This project will replace the bridges carrying I-83 over Padonia Road. Replacing structurally deficient bridges saves money on future maintenance spending and supports safety and mobility as part of SHA’s bridge system preservation program. This project is funded for construction under Governor Larry Hogan’s Investment in Highways and Bridges program aimed at addressing Maryland’s structurally deficient bridges. The scope of project includes the addition of a left turn lane for motorists traveling on eastbound Padonia Road wishing to access the ramp for I-83 North. In addition, I-83 southbound Ramp B at Padonia Road will be widened to reduce the length of the traffic queue. This identified traffic improvement can now be accommodated with new longer bridge.
The bridges will be replaced in stages with all lanes of traffic on I-83 maintained at all times. The proposed construction will likely require lane closures on Padonia Road to allow for construction of new bridge and provide a safe work zone for the workers. As part of the Maintenance of Traffic, the ramp from eastbound Padonia Road to I-83 North will be closed during construction. This closure will require that the ramp traffic be detoured onto Deereco Road south to the I-83 North ramp at the Timonium Road/I-83 interchange for about 3 years until the widening of Padonia Road is completed.
This project bids on April 5, 2018 at 12:00 PM (ET).
The bridges will be replaced in stages with all lanes of traffic on I-83 maintained at all times. The proposed construction will likely require lane closures on Padonia Road to allow for construction of new bridge and provide a safe work zone for the workers. As part of the Maintenance of Traffic, the ramp from eastbound Padonia Road to I-83 North will be closed during construction. This closure will require that the ramp traffic be detoured onto Deereco Road south to the I-83 North ramp at the Timonium Road/I-83 interchange for about 3 years until the widening of Padonia Road is completed.
This project bids on April 5, 2018 at 12:00 PM (ET).
Posted On:
2018-03-15 11:15:53
Notes:
Plans and Specs: https://secure.smartbidnet.com/External/PublicPlanRoom.aspx?Id=357839
All Subcontractor/Supplier quotes are due by April 3, 2018
Fax quotes to: (404) 495-8701 reference project name and scope of work.
For more information, please contact Joe Fortuchang, 404-495-8700 or jfortuchang@walshgroup.com
All Subcontractor/Supplier quotes are due by April 3, 2018
Fax quotes to: (404) 495-8701 reference project name and scope of work.
For more information, please contact Joe Fortuchang, 404-495-8700 or jfortuchang@walshgroup.com
Contact Information
Name:
Joe Fortuchang
Phone Number:
404-495-8700
Email Address:
jfortuchang@walshgroup.com
Forms And Attachments