All Information
Company Name:
The Whiting-Turner Contracting Company
Bid Title:
Southern Maryland Higher Education Center
Bid Due Date:
3/15/18
Bid Due Date Time:
5:00 PM
Request For Qualifications Due Date
2/8/18
Request For Qualifications Due Date Time
5:00 PM
Project Description:
The project is a new two-story, 84,381 SF academic and research building at the Southern Maryland Higher Education Center, including classrooms, laboratories, conference spaces, and faculty offices. A concrete substructure is included for below grade foundation walls and footings. The building superstructure will be structural steel with concrete on metal decking. The skin consists of a variation of curtain wall, brick veneer; composite panels brick, window system with a corrugated perforated meal screen system in some locations. Interior finishes include items such as metal stairs, metal gratings and platforms, glass railings, drywall, acoustical, interior glazing, brick, wood paneling, carpet, vinyl flooring, lab flooring, polish concrete, tile, fabricate wrap panels, & sound absorbing panels. Project also includes items such as accordion fire door, rolling doors, operable partitions, lab casework and equipment, anechoic chamber, RF shielding, and FF&E Lab Equipment, MEP systems include new HVAC, plumbing, fire protection, electrical, fire alarm, and complete low voltage systems for AV, Security, and Tele Data. The project is designed under the US Green Building Councils LEED 2009 for New Construction for a LEED Silver level rating. The warranty period shall be (2) years.
Bid Packages:
• 031A- Earthwork
• 033A- Site Utilities (Wet)
• 002A- Site Surveying
• 002B- 3rd Party Independent Testing & Inspections
Bid Packages:
• 031A- Earthwork
• 033A- Site Utilities (Wet)
• 002A- Site Surveying
• 002B- 3rd Party Independent Testing & Inspections
Posted On:
2018-01-23 11:32:09
Notes:
Schedule
Prequalification Period- Jan 22- Feb 8 Deadline to receive prequalification statements is by Feb 8, 5:00pm.
Bid Period- Feb 15 – March 15- Bids due on March 15 by 5pm.
Construction Start- Planned start June 2018 (Anticipated - 24-month construction schedule)
Directions for Subcontractor Prequalification
• Go to https://whiting-turner.box.com/s/7fokn5mnchp0q65n2wuwk74ltkwinu79
• Download the form
• Complete the form
• Email to gary.murphy@whiting-turner.com
Prequalification Period- Jan 22- Feb 8 Deadline to receive prequalification statements is by Feb 8, 5:00pm.
Bid Period- Feb 15 – March 15- Bids due on March 15 by 5pm.
Construction Start- Planned start June 2018 (Anticipated - 24-month construction schedule)
Directions for Subcontractor Prequalification
• Go to https://whiting-turner.box.com/s/7fokn5mnchp0q65n2wuwk74ltkwinu79
• Download the form
• Complete the form
• Email to gary.murphy@whiting-turner.com
Contact Information
Name:
Gary Murphy- Project Manager
Phone Number:
703-825-2267
Email Address:
Gary.murphy@whiting-turner.com
Name:
Dean Speed – Assistant Project Manager
Phone Number:
571-235-7820
Email Address:
Dean.speed@whiting-turner.com
Forms And Attachments